FIT-FOR-PURPOSE PLATFORMS AT SEA

Scope of our service

  • Electric & Instrument
    1. Cable Support & Cable Tray Installation
    2. Cable Pulling
    3. Connection & Termination
    4. FAT/RI Punch Work
    5. Equipment Installation
    6. MC & Testing
    7. Pre-commissioning & Commissioning
    8. Modification
    9. Material Supply
  • Mechanical
    1. Preservation
    2. FAT/RI Punch Work
    3. Equipment assembly
    4. Equipment Installation & Alignment
    5. Equipment Installation
    6. MC & Testing & Instrumentation
    7. Pre-commissioning & Commissioning
    8. Modification
    9. Material Supply

Our offshore activities include procurement construction and installation of fixed and floating platforms for the energy industry.

Scope of our service

  • Piping
    1. Piping Spool & Installation
    2. MC & Testing (Oil flushing & Hydro test)
    3. Pre-commissioning & Commissioning
    4. Modification
    5. Heat Tracing
    6. Material Supply
    7. Flange Management
  • Tubing
    1. Installation
    2. MC & Commissioning
    3. Punch work
    4. Modification
    5. Material Supply
  • Manpower Supply
    1. Supervisor
    2. Engineer
    3. Designer
    4. Welder (Carbon, Stainless Steel, Alloy, Duplex, Super Duplex, Titanium, Cu- Ni, Incornel, Etc.)
    5. Fitter
    6. Electrician
    7. Mechanic
    8. General Worker (System Technician)
  • Fabrication

    We have done before & on going ex) Waste Skip , Cargo Basket , Working Basket , Tool Box , Gas Bottle Rack, Additional Storage Room, Lifting Beam, Cable Reel, Hose Reel(4.5M~10.5M), BOP Step Ladder, Sub Pipe Rack, Platform, Walkway Step Ladder, Working Table, Trolley Hoist &Monorail, Oil Tank, Recovery Tank, Grating Walkway & Handrail, Safety Cage, Hatch Cover Etc